Clapham Junction Platform 16

difficulties at Platform 16 in dispatching longer trains led to Softech's engagement to look into Signalling alterations to overcome operational issues.

Client

Network Rail

Project Completed

Sep 2014

Project Overview

Due to operational difficulties at Platform 16, Signalling alterations were required at Clapham Junction Platform 16 as part of West London Line project

Due to curvature of the track layout on platform 16 at Clapham junction, there were operational difficulties at Platform 16 in dispatching longer trains for which Softech was engaged to look into the Signalling alterations to overcome operational issues.

Signalling Scheme sketch was prepared after Signal sighting review during GRIP stage 3 keeping minimum alterations to Signalling arrangements.
Detailed design was also prepared during GRIP stage 5 for Clapham junction after correlation of existing infrastructure.

Our Work: Case Studies

Haxby Telecoms Design
Carrying out site survey and telecoms detailed design for NR owned assets which includes station information and surveillance system.
Jan 26, 2024
Eastbourne Siding
Softech conducted a condition assessment to confirm that the existing signalling system is capable of performing the required train movements.
Dec 5, 2023
Radlett
This study was completed to assess how best to path down direction freight trains between the Midland Main Line and the proposed SRFI at Radlett.
Jan 12, 2016
Richmond Platform 3
Enhanced rail signalling for Richmond Platform 3 under LOCIP ensures efficient 5-car operations. Softech's ensures optimal design solutions.
Jul 16, 2015

Get your project costed.

If you would like an estimation, leave your details below and our pricing team will get in touch with you within 24 hours.

9 + 7 =

Consult us, remotely.

Alternatively, you can book a remote consultation with us via Microsoft Teams.