Eastbourne Siding

Softech conducted a condition assessment to confirm that the existing signalling system is capable of performing the required train movements.

Client

Volker Fitzpatrick

Project Completed

Dec 2023

Project Overview

a building with a clock tower | Eastbourne Siding

One service a day from Eastbourne – Lovers Walk was running empty to Brighton Depot and returning following morning. To prevent this move and to close Newhaven Marine branch line, Eastbourne siding was required to be electrified to make it operational.

Softech’s team of technical experts reviewed the existing Signalling circuits to undertake a condition Assessment to confirm that the existing signalling system is capable of performing the train moves required by the TOC to service the siding from the station.

Signal/Signage sighting and Operational Risk Assessment was conducted to develop the signalling scheme sketch depicting the signalling arrangements with supporting documents during GRIP stage 3.

Our Work: Case Studies

Haxby Telecoms Design
Carrying out site survey and telecoms detailed design for NR owned assets which includes station information and surveillance system.
Jan 26, 2024
Radlett
This study was completed to assess how best to path down direction freight trains between the Midland Main Line and the proposed SRFI at Radlett.
Jan 12, 2016
Richmond Platform 3
Enhanced rail signalling for Richmond Platform 3 under LOCIP ensures efficient 5-car operations. Softech's ensures optimal design solutions.
Jul 16, 2015
Clapham Junction Platform 16
difficulties at Platform 16 in dispatching longer trains led to Softech's engagement to look into Signalling alterations to overcome operational issue...
Sep 16, 2014

Get your project costed.

If you would like an estimation, leave your details below and our pricing team will get in touch with you within 24 hours.

4 + 11 =

Consult us, remotely.

Alternatively, you can book a remote consultation with us via Microsoft Teams.