OLE Installation

Safely Delivering Railway Projects in Electrified Environments with Expert Integration Expertise

Image showing two men installation overlead line equipment

At Softech Rail, we understand the precision, planning, and technical skill required to carry out safe and effective OLE installation in live railway environments. We play a hands-on role in delivering complex Overhead Line Equipment (OLE) installation projects, providing expert interface management, logistical coordination, and disciplined site execution. Our teams are fully trained to operate safely around live overhead systems, maintaining the highest standards of compliance, awareness, and safety performance.

Whether working on new electrification programmes or upgrading existing infrastructure, we deliver OLE installation solutions that ensure seamless integration, minimal disruption, and reliable progress throughout the project lifecycle.

Working Safely Within Electrified Rail Environments

Operating in live OLE environments demands meticulous planning, specialised training, and precise execution. Softech Rail delivers expert support for OLE installation, ensuring full compliance with isolation procedures, safe systems of work, and industry standards. Our teams are trained to work confidently around high-voltage systems, creating a structured and controlled environment for safe and efficient delivery.

We are experienced in managing possessions, isolations, and track access during OLE installation works, helping to minimise risk and maintain programme momentum. Whether planning safe access to live infrastructure or overseeing high-risk activities, we apply rigorous safety protocols at every stage. Safety is at the core of our OLE installation approach, ensuring reliable outcomes in even the most challenging railway settings.

Image showing Rail workers nearing completion of Rail OLE Installation

Supporting OLE Interface Management and Project Delivery

We specialise in managing the complex interfaces within OLE infrastructure during OLE installation projects. From early-stage planning—such as clearance assessments, structural alignment, and equipment positioning—to on-site coordination, our teams ensure that OLE installation activities are delivered accurately, efficiently, and safely. By working closely with OLE installation contractors and adhering to Network Rail standards, we help prevent clashes, minimise delays, and reduce the risk of costly reworks.

Our proactive approach to interface and installation management plays a critical role in supporting major OLE installation schemes, including platform extensions, depot upgrades, and full route electrification projects. We ensure that every aspect of the OLE installation process is delivered with precision and care, maintaining programme certainty and keeping infrastructure projects on track and within budget.

Image showing Rail workers on site installing overhead line equipment (OLE).

OLE Installation Capabilities

We have expertise in safely delivering works within electrified environments and managing OLE interfaces:

    • OLE interface management and clash avoidance

    • Proximity working and isolation planning

    • Compliance with Network Rail OLE standards

    • Multi-disciplinary coordination alongside OLE contractors

    • Possession and access planning within electrified zones

    • Clearance assessments and equipment positioning

    • Risk management for high-voltage infrastructure

    • Supporting depot and station upgrades in OLE environments

    • Interface support for platform extensions and route renewals

    • Safe systems of work in live OLE projects

    • Operational readiness support and commissioning integration.

       

Enabling Reliable Electrified Railways

Our role in OLE installation projects is to ensure seamless coordination and integration across complex, electrified railway environments. Softech Rail provides dedicated support throughout the OLE installation phase, ensuring all components are installed safely, efficiently, and in full alignment with project specifications. Our clear communication with multi-disciplinary teams helps manage risk and maintain momentum, enabling consistent progress even in challenging live railway conditions.

Through trusted partnerships and an unwavering commitment to delivery excellence, we help ensure that OLE installation projects are executed to the highest standards—meeting current requirements and supporting the long-term performance of the UK’s electrified rail network.

Image of Rail Signal

Our Rail OLE Installation Projects

High Speed-1 Rail Link OLE Adjustment
Softech supported the Purfleet Station Level Crossing Replacement by designing and delivering adjustments to the OLE system. Our solution ensured safe...
Jun 22, 2022
India OCS Design, Install & Test
Softech supported Indian Railways’ Mission Electrification by delivering over 3,100 km of OCS design, installation and testing. Our expert teams tac...
Feb 15, 2021
Maidenhead OLE Installation Testing
Softech supported the Crossrail programme by inspecting OLE installations along the Maidenhead stretch. Our team identified structural deviations, gui...
Apr 22, 2017
East Coast Power Supply Upgrade
Softech provided CRE-OLE services to support Jacobs on the East Coast Power Supply Upgrade. Our role focused on OLE design and bonding solutions to in...
Aug 15, 2015

Latest OLE PR, News & Insights

High Capacity Rail Corridors

High capacity rail corridors handle both freight and passenger traffic requirements. However, meticulous planning and optimisation of Overhead Line...

May 1, 2024
Innovations in Overhead Line Layout

Innovations in Overhead Line Layout In the realm of railway electrification, innovation is the driving force that shapes the future of rail...

Apr 1, 2024

Get your OLE Installation project costed.

If you would like an estimation, leave your details below and our pricing team will get in touch with you within 24 hours.

5 + 3 =

Consult with us, remotely.

Alternatively, you can book a remote consultation with us via Microsoft Teams.