Purfleet Signalling and Telecoms Design

Signalling and Telecoms GRIP 4 designs for Level Crossing recovery and new station building construction, ensuring Signal Sighting following thorough site surveys.

Client

Waterman

Project Completed

February 2024

The Challenge For Softech

This project involves comprehensive design work across all disciplines to support the replacement of the existing station building with a new structure. One significant aspect of the project addresses the current at-grade level crossing of the railway line and London Road. This crossing poses challenges to traffic flow due to waiting times and safety concerns, especially for heavy goods vehicles serving industrial uses in the eastern part of Purfleet and local residential movement. The design mandate entails ensuring minimal disruption and no impact on Signal signage sighting for all new infrastructure, including the station building, footover and Roadbridge.

ES4 & ES5 Designs

Crossings

Signal Sighting

Cabinet Designs

Road and Foot Bridges

Stations

Softech’s Solutions

We meticulously conducted extensive site surveys and inspections to assess the impacted assets against the new Civils and Architectural designs. Signal and signage sighting evaluations were performed to mitigate any adverse effects.

criss crossed rail alignment design engineered by a railway pway design team

Signalling Scheme Plans along with supporting documentation were developed to facilitate the Level Crossing recovery with minimal interlocking alterations. conducted and attended IDC/IDR (Inter- disciplinary checking), ensuring seamless integration with other engineering disciplines and effective management of potential impacts on existing infrastructure affirming the design’s holistic efficacy.

The Result

Softech is proud to play a pivotal role in this groundbreaking initiative, in collaboration with Thurrock Council. This ambitious £1 billion project aims to revolutionise Purfleet-on-Thames, creating a world-class creative hub and vibrant town center, alongside constructing up to 2,850 modern residences. 

 

The scheme also includes an integrated medical center and substantial transport improvements, reflecting our commitment to shaping the future of Purfleet-on-Thames.

Feedback

5/5

How would you rate the technical knowledge and skills of Softech Rail’s staff?

5/5

How likely is it that you would be happy to work with Softech Rail in the future?

|

"Pleased with Softech's proactive approach...always going the extra mile to keep quality, cost and program on target."

Manoj Gupta

“Pleased with Softech’s proactive approach and always going the extra mile to keep the quality, cost and program on target…the design team take keen interest to highlight any design or delivery issues as soon as they are known to them and thus ensuring a fast and efficient resolution.”

Rail Sector Director Waterman

Case Studies

We have successfully delivered over 115 projects, on time and in budget over the last 18 years.

Haxby Telecoms Design
Carrying out site survey and telecoms detailed design for NR owned assets which includes station information and surveillance system.
Dec 7, 2023
Eastbourne Siding
Softech conducted a condition assessment to confirm that the existing signalling system is capable of performing the required train movements.
Dec 5, 2023
Clacton-on-Sea
GRIP3 and GRIP4 project development and design to build a new depot for Rail Wheel Lathe facility.
Apr 22, 2022
Radlett
This study was completed to assess how best to path down direction freight trains between the Midland Main Line and the proposed SRFI at Radlett.
Jan 12, 2016
Richmond Platform 3
Enhanced rail signalling for Richmond Platform 3 under LOCIP ensures efficient 5-car operations. Softech's ensures optimal design solutions.
Jul 16, 2015
Clapham Junction Platform 16
difficulties at Platform 16 in dispatching longer trains led to Softech's engagement to look into Signalling alterations to overcome operational issue...
Sep 16, 2014
Fishbourne
Fishbourne Miniature Light (MWL) Footpath crossing had a history of misuse and vandalism causing disruption.
Apr 16, 2014

Get your project costed.

If you would like an estimation, leave your details below and our pricing team will get in touch with you within 24 hours.

4 + 2 =

Consult us, remotely.

Alternatively, you can book a remote consultation with us via Microsoft Teams.