Breaking Down Signal Failures: What Causes Them and How to Prevent Disruptions

Category

Published

28 Apr 2025

Share this post

Breaking Down Signal Failures: What Causes Them and How to Prevent Disruptions

Few things are as disruptive to rail operations as signal failures. They cause delays, cancellations, passenger frustration, and financial losses, impacting everything from daily commutes to freight logistics. While the occasional failure is inevitable, understanding what causes them and how they can be prevented is crucial for keeping the rail network moving efficiently.

At Softech Rail, we’ve worked extensively on rail signalling design, infrastructure upgrades, and fault mitigation strategies, and we’ve seen first-hand how proactive maintenance and modernisation can drastically reduce failures. But what exactly leads to signal failures, and what can be done to future-proof the railway against them?

Understanding Why Signal Failures Happen

Rail signalling systems are built to be highly reliable, yet failures still occur due to a range of technical, environmental, and human factors. Whether caused by aging infrastructure, external interference, or system malfunctions, signal failures can cripple an entire network in minutes.

An image displaying legacy Signalling Systems. Including a track in the centre, a signal office to the left and Signals to the right.

Aging Infrastructure: When Systems Reach Their Limits

Many rail networks still rely on legacy signalling systems—some dating back decades—where relay-based interlockings, track circuits, and mechanical components are still in use. Over time, exposure to weather, wear and tear, and operational stress takes its toll. Corrosion in relay contacts, degraded wiring insulation, and outdated interlocking mechanisms can all lead to unreliable signals. When failures occur, they often require manual intervention and extensive troubleshooting, leading to longer delays.

At Softech Rail, we’ve seen the critical impact of modernising these systems. On the Bethnal Green to Shenfield route, we upgraded signalling power from outdated Class I radial feeders to a modern Class II ring network, significantly improving reliability and reducing power supply-related signal failures. This type of proactive investment in infrastructure is key to eliminating the risks associated with aging systems.

Power Supply Failures: The Silent Cause of Signal Disruptions

Rail signals require a constant and stable power supply. Any disruption—whether from equipment faults, substation failures, or even external interference—can result in signals going dark, misfiring, or failing to update correctly. In some cases, power surges or fluctuations can damage equipment, requiring costly repairs.

Cable theft remains a significant issue in some regions, where theft of signalling power cables leads to entire sections of track losing functionality. The financial cost isn’t just in replacement materials; it’s in the delays, safety risks, and reputational damage that follow.

One of the most effective strategies is resilient power distribution. Implementing dual-fed power systems and using fault-tolerant Class II cabling, like we did at Shenfield Station, ensures that if one power source fails, another takes over seamlessly, keeping the network operational.

Communication Failures: The Hidden Weak Link

Modern railway signalling depends on continuous, real-time communication between trackside equipment and control centres. Any disruption to data transmission—whether through fibre optic failures, GSM-R dropouts, or hardware malfunctions—can result in signalling faults. A signal that cannot relay its correct status leads to trains being held at a stop for safety, even if there’s no physical obstruction.

At Softech Rail, we understand the importance of a robust telecoms network in supporting railway signalling. On projects involving remote monitoring and networked interlockings, we’ve implemented high-redundancy telecom networks with automatic failover pathways, ensuring that even if a primary link is lost, the backup system keeps critical signals online.

Environmental and External Disruptions: Weather, Wildlife, and Vandalism

The UK’s unpredictable weather plays a significant role in signal failures. Extreme temperatures, heavy rain, ice, and lightning all contribute to signal malfunctions, equipment damage, and power supply instability. Freezing conditions can cause track circuit failures, while extreme heat can expand metal components, leading to misalignments.

Beyond weather, wildlife interference and vandalism also impact signalling performance. Rodents chewing through cables, birds nesting in relay cabinets, and deliberate acts of vandalism all lead to unexpected disruptions.

Solutions vary, but weatherproofing, secure cable routing, and anti-trespassing measures have proven effective in reducing these risks. Implementing self-healing track circuits, as seen in some modern ETCS deployments, allows systems to automatically reconfigure when faults are detected, reducing service interruptions.

Human Error: When Maintenance or Installation Goes Wrong

Despite automation, humans remain a crucial part of railway signalling operations. Mistakes in installation, maintenance, software updates, or operational procedures can introduce faults that lead to signal failures. Misconfigured interlockings, incorrectly wired circuits, or failures to update control software have all been responsible for significant network disruptions in the past.

To combat this, comprehensive training, real-time monitoring, and automated diagnostic tools are essential. Digital twins—where virtual models of signalling systems are tested before real-world deployment—are becoming increasingly valuable in ensuring system reliability.

How to Prevent Signal Failures: The Future of Rail Resilience

While signal failures will never be completely eliminated, modern railway technology is reducing their frequency and impact. The key to prevention lies in three core areas:

Modernising Legacy Systems

Transitioning from relay-based signalling to digital interlockings ensures greater reliability, remote monitoring, and faster fault detection.

Resilient Infrastructure

Redundant power and telecom networks prevent single points of failure from crippling the system.

Predictive Maintenance and AI Monitoring

Using real-time data analytics and AI-driven fault detection to identify weaknesses before they cause failures, allowing for proactive repairs rather than reactive crisis management.

At Softech Rail, we have worked on projects that integrate these solutions, ensuring rail networks remain operational and safe. Our work at Wimbledon Tramlink, for example, focused on improving signalling infrastructure to enhance service reliability, preventing unplanned failures from disrupting operations.

The Bottom Line: Keeping Railways Moving

Signal failures aren’t just technical issues; they have real-world consequences. They delay passengers, disrupt freight operations, and cost millions in lost revenue and repairs. The key to minimising failures lies in modernisation, resilient design, and proactive maintenance—ensuring that when failures do occur, their impact is minimal.

For railway operators, investing in advanced signalling solutions isn’t just about compliance—it’s about operational excellence. A railway that runs efficiently, with fewer failures and disruptions, builds trust with its users and maintains long-term reliability.

At Softech Rail, we work with rail operators and project leaders to design, upgrade, and future-proof railway signalling infrastructure. If you’re looking to reduce signalling failures and improve network reliability, get in touch with us today.

After something specific?

Featured Videos

Follow Us

Latest Articles

Enhancing Passenger Experience with Smart Telecom Solutions

Enhancing Passenger Experience with Smart Telecom Solutions In today’s digital-first world, passengers expect more than just a mode of transport—they want a seamless, connected, and informed journey. Gone are the days when travellers relied solely on station...

Article Categories

Our Work: Case Studies

Cumbrian Line Telecoms Design
Softech conducted site surveys to assess existing FTN card availability, ensuring an efficient use of infrastructure. By arranging a Direct Circuit Al...
Jun 20, 2024
Haxby Telecoms Design
Carrying out site survey and telecoms detailed design for NR owned assets which includes station information and surveillance system.
Jan 26, 2024
Eastbourne Siding
Softech conducted a condition assessment to confirm that the existing signalling system is capable of performing the required train movements.
Dec 5, 2023
Radlett
This study was completed to assess how best to path down direction freight trains between the Midland Main Line and the proposed SRFI at Radlett.
Jan 12, 2016
Richmond Platform 3
Enhanced rail signalling for Richmond Platform 3 under LOCIP ensures efficient 5-car operations. Softech's ensures optimal design solutions.
Jul 16, 2015