Proposed to have 8 car long Eastbourne portion of train to depart first (4 minutes earlier) and the shorter 4 car portion, later, to Seaford.

Client

Network Rail

Project Completed

Aug 2013

Project Overview

Lewes railway station located between Haywards Heath and Eastbourne were seeking to improve journey time for passengers on the 8 car Eastbourne to Ore portion of a train which was splitting at Lewes station Platform 1. The Other 4 car portion of the train destined to Seaford, departed first but was not able to make full use of its early departure as it was delayed in the Newhaven area.

This scheme was proposed to have 8 car long Eastbourne portion of train to depart first (4 minutes earlier) and the shorter 4 car portion, later, to Seaford.

All options were studied in detail and option selection report was prepared along with the Sketches during GRIP stage 3 stating pros and cons of all considered options.

Our Work: Case Studies

Haxby Telecoms Design
Carrying out site survey and telecoms detailed design for NR owned assets which includes station information and surveillance system.
Jan 26, 2024
Eastbourne Siding
Softech conducted a condition assessment to confirm that the existing signalling system is capable of performing the required train movements.
Dec 5, 2023
Radlett
This study was completed to assess how best to path down direction freight trains between the Midland Main Line and the proposed SRFI at Radlett.
Jan 12, 2016
Richmond Platform 3
Enhanced rail signalling for Richmond Platform 3 under LOCIP ensures efficient 5-car operations. Softech's ensures optimal design solutions.
Jul 16, 2015

Get your project costed.

If you would like an estimation, leave your details below and our pricing team will get in touch with you within 24 hours.

13 + 11 =

Consult us, remotely.

Alternatively, you can book a remote consultation with us via Microsoft Teams.