We successfully deliver, on time and on budget with 0 CAT 3 DRNs

    • Signalling
    Radlett
    This study was completed to assess how best to path down direction freight trains between the Midland Main Line and the proposed SRFI at Radlett.
    Jan 12, 2016
    Richmond Platform 3
    Enhanced rail signalling for Richmond Platform 3 under LOCIP ensures efficient 5-car operations. Softech's ensures optimal design solutions.
    Jul 16, 2015
    Clapham Junction Platform 16
    difficulties at Platform 16 in dispatching longer trains led to Softech's engagement to look into Signalling alterations to overcome operational issue...
    Sep 16, 2014
    Fishbourne
    Fishbourne Miniature Light (MWL) Footpath crossing had a history of misuse and vandalism causing disruption.
    Apr 16, 2014
    Jhansi
    Civils/track/electrical/mechanical signalling items for replacement of turnouts at various station in BINAGC section of Jhansi division.
    Mar 19, 2014
    Swindon & Slough
    Softech provided design support and production from GRIP stage 5 onwards. As part of delivery, the design was produced in 3 phases.
    Oct 29, 2013
    Lewes
    Proposed to have 8 car long Eastbourne portion of train to depart first (4 minutes earlier) and the shorter 4 car portion, later, to Seaford.
    Aug 29, 2013