We successfully deliver, on time and on budget with 0 CAT 3 DRNs

  • Signalling
Clapham Junction Platform 16
difficulties at Platform 16 in dispatching longer trains led to Softech's engagement to look into Signalling alterations to overcome operational issue...
Sep 16, 2014
Littlehaven
Enhanced platform extension at Littlehaven for seamless 8 and 12-car services. Softech's signalling design ensures efficient rail operations.
Aug 12, 2014
Fishbourne
Fishbourne Miniature Light (MWL) Footpath crossing had a history of misuse and vandalism causing disruption.
Apr 16, 2014
Jhansi
Civils/track/electrical/mechanical signalling items for replacement of turnouts at various station in BINAGC section of Jhansi division.
Mar 19, 2014
Swindon & Slough
Softech provided design support and production from GRIP stage 5 onwards. As part of delivery, the design was produced in 3 phases.
Oct 29, 2013
Lewes
Proposed to have 8 car long Eastbourne portion of train to depart first (4 minutes earlier) and the shorter 4 car portion, later, to Seaford.
Aug 29, 2013
Stalybridge
Liverpool to Leeds via Manchester Victoria, controlling the junction of the line to and from Guide Bridge together with the station area.
Dec 7, 2012
Earlestown
Work to achieve reduction in journey time to 30minutes between Liverpool and Manchester Oxford Road via Chat Moss from 43 Minutes.
Dec 5, 2011
Skipton Carlisle
Improve journey time between Skipton and Carlisle by increasing the line speed to 75mph in specific sections.
Jul 15, 2011
Halton Curve
Introducing a direct train service from Chester to Liverpool Lime Street via Halton Curve required a second Railway Line.
Jul 5, 2011