by Softech Rail | 20/06/24
Softech conducted site surveys to assess existing FTN card availability,
ensuring an efficient use of infrastructure. By arranging a Direct Circuit Allocation (DCA), the team optimised FTN capacity and mitigated the need for extensive hardware replacements.
by Softech Rail | 26/01/24
Carrying out site survey and telecoms detailed design for NR owned assets which includes station information and surveillance system.
by Softech Rail | 14/12/23
Signalling and Telecoms designs for highway Bridge, reconstruction of entire station including shopping concourse and lowering of OLE catenary.
by Softech Rail | 08/12/23
Carrying out site survey and telecoms detailed design for NR owned assets which includes station information and surveillance system.
by Softech Rail | 20/10/23
ES4, ES5 Designs, Site surveys for the identification of affected cable routes and production of detailed designs. Testing and commissioning