Stalybridge

GRIP stage 5 (Detailed Design Stage)

Client: Amey Signalling

Date: December 2012

Project Overview

The scope of work was the combination of a re-signalling scheme, the requirement to replace life expired permanent way, to improve the operational functionality and capacity in the area around Stalybridge Station. These improvements included remodelling of the track layout at Stalybridge Junction and Stalybridge Tunnel Junction with the line speed between Stalybridge Junction and Stalybridge Tunnel Junction increased to 50mph and an increase in crossover route speeds from 15mph to 25mph.

Under this scheme, track layout alterations required removing the existing goods lines and provided an additional west facing bay platform and through platform line.
A new free-wired Route Relay Interlocking was provided at Stalybridge to replace the existing electro-mechanical signal box.
Part of the re-signalling project was to provide a new control system for the Stalybridge, Guide Bridge and Ashburys areas located in the existing Manchester South Signalling Control Centre at Stockport (Edgeley) with capacity to control Ashton Moss North Junction Baguley Fold, Diggle Junction, Denton Junction, Dinting and Romiley in the future.

Softech provided the design support for GRIP 5 stage.
Due to the extent of the work, this project was completed in many stages:
• Stage W1: Abandonment of Bay Platform and Ups Goods & Down Goods Lines
• Stage W5: Power Stage for W6 Works
• Stage W6: Commissioning of Signalling to the East of Stalybridge Tunnel
• Stage W7: Stalybridge Tunnel Junction-Recovery of Points
• Stage W8: Stalybridge Tunnel Junction-Installation of Points
• Stage W9: Stalybridge Tunnel Junction- Recovery of Points
• Stage W13: Stalybridge Signal GB846
• Stage W25: Stalybridge Junction – Installation of Points
• Stage W26: Stalybridge Junction – Installation of Points
• Stage W28: Stalybridge Junction – Recovery and Installation of Points

Delivered Projects

We have successfully delivered over 115 projects, on time and in budget over the last 18 years.

Eastbourne Siding
Softech conducted a condition assessment to confirm that the existing signalling system is capable of performing the required train movements.
Dec 5, 2023
Shenfield Station
Seamless rail systems at Shenfield Station enhanced with expert signalling design solutions. Optimise operations with precision rail design services.
Jan 11, 2023
Clacton-on-Sea
GRIP3 and GRIP4 project development and design to build a new depot for Rail Wheel Lathe facility.
Apr 22, 2022
Western and Wales
Emergency or Temporary Speed Restrictions are imposed as measures to ensure the safety of train operations and the integrity of Rail infrastructure
Aug 15, 2020
Radlett
This study was completed to assess how best to path down direction freight trains between the Midland Main Line and the proposed SRFI at Radlett.
Jan 12, 2016
Richmond Platform 3
Enhanced rail signalling for Richmond Platform 3 under LOCIP ensures efficient 5-car operations. Softech's ensures optimal design solutions.
Jul 16, 2015
Clapham Junction Platform 16
difficulties at Platform 16 in dispatching longer trains led to Softech's engagement to look into Signalling alterations to overcome operational issue...
Sep 16, 2014
Littlehaven
Enhanced platform extension at Littlehaven for seamless 8 and 12-car services. Softech's signalling design ensures efficient rail operations.
Aug 12, 2014
Fishbourne
Fishbourne Miniature Light (MWL) Footpath crossing had a history of misuse and vandalism causing disruption.
Apr 16, 2014
Jhansi
Civils/track/electrical/mechanical signalling items for replacement of turnouts at various station in BINAGC section of Jhansi division.
Mar 19, 2014

Testimonials

What our clients say

"Network Rail has hardly issued any error report, this is an indication of the work produced by Softech. Softech seems to be very proactive in following issues and coming back with solutions."

Afshin Persian
Senior Project Manager, Jacobs Engineering 

"Softech are very good at delivering work. Many thanks for all of your help in meeting the demanding challenges faced on the Stalybridge Re-signalling project."

Richard Green
Principal Project Manager, Amey, Uk

"Softech have made every deadline put to them, provided excellent conduct and good working relationships, Softech understood Network Rail requirements and risks associated with taking GRIP4 designs from another party.

Andy Chaplin
Senior Programme Engineer, Network Rail, UK

 "There can be difficulties when trying to integrate a team of designers into both a design house and a running project.
It is therefore a great credit to Softech that they were able to become part of the Gatwick team and integrate themselves so easily to enable the successful completion of the Gatwick project."

Chris Morgan
Design Delivery Manager, Alstom

 "Softech has a good understanding of client requirements, providing excellent service, very satisfied, met all deadlines."

Duncan Lyons
Project Manager, Tata Steel Projects, UK

"Softech understood exactly the level of expertise required. All tasks were delivered in the timescales required some of which at short notice. Completely satisfied with the services provided."

Paul Waby
Signalling And Systems Design Engineering Manager, Alstom

"I am very happy with the quality of work supplied by Softech and would not hesitate to recommend them to other companies."

Andrew Thomas
S&T Standards Manager, Network Rail (High Speed), UK

"The Contract Responsible Engineer for this package of work has done a fantastic job in delivering the full scope of work. The Crossrail Signalling Engineering team has found Softech to be very thorough with their work. The number of design comments raised have been minimal. It has been a real pleasure working with them."

Sean Tarpey
Senior Project Engineer, Crossrail (Network Rail)