Eastbourne Siding
Softech conducted a condition assessment to confirm that the existing signalling system is capable of performing the required train movements.
Softech conducted a condition assessment to confirm that the existing signalling system is capable of performing the required train movements.
Provide extra passenger capacity on the West London Line (WLL) by lengthening the station platforms
ES4, ES5 Designs, Site surveys for the identification of affected cable routes and production of detailed designs. Testing and commissioning
Softech supported the Purfleet Station Level Crossing Replacement by designing and delivering adjustments to the OLE system. Our solution ensured safe clearances for a new highway bridge while maintaining efficient rail operations.
Softech undertook ES3 & ES4 designs for the Clacton-On-Sea Depot Signalling project, including Signal Sighting following thorough site surveys.