Eastbourne Siding

Softech conducted a condition assessment to confirm that the existing signalling system is capable of performing the required train movements.

High Speed-1 Rail Link OLE Adjustment

Softech supported the Purfleet Station Level Crossing Replacement by designing and delivering adjustments to the OLE system. Our solution ensured safe clearances for a new highway bridge while maintaining efficient rail operations.