Doncaster Inland Port

Doncaster Inland Port PWay Design Client: Network Rail Date: Project Overview PWAY Design for feasibility and then for Stage 1 for this new Port Discuss your project Softech Scope of work: PWay Designs: a) Feasibility study and layout over google earth b) Full PWay...

Eastbourne Siding

Eastbourne Siding GRIP stage 3 (Option Selection) Client: Volker Fitzpatrick Date: Project Overview One service a day from Eastbourne – Lovers Walk was running empty to Brighton Depot and returning following morning. To prevent this move and to close Newhaven...

WLL Clapham Junction

WLL Clapham Junction GRIP stage 5 (Detail Design) Client: Network Rail Date: Project Overview This project was to provide extra passenger capacity on the West London Line (WLL) by lengthening the station platforms to allow the operation by Southern of 8-car trains...

Shenfield Station

Shenfield Station Provision of TRTS and CDRA on six platforms GRIP4-8 Client: Murphy Group Date: Project Overview Passenger service of 9 car (FLU) 345s on the eastern route (London Liverpool Street to Shenfield station) has been recently introduced. The project seeks...

Clacton-on-Sea

Clacton-on-Sea Client: Egis Rail GRIP3 and GRIP4 project development and design Date: Project Overview The proposed wheel lathe facility was to be built on a new southbound spur from the dead-end siding (Shunting Spur) back towards the carriage sidings to enable...