OLE Projects

We successfully deliver, on time and on budget with 0 CAT 3 DRNs

  • Signalling
  • OLE
Lewes
Proposed to have 8 car long Eastbourne portion of train to depart first (4 minutes earlier) and the shorter 4 car portion, later, to Seaford.
Aug 29, 2013
Stalybridge
Liverpool to Leeds via Manchester Victoria, controlling the junction of the line to and from Guide Bridge together with the station area.
Dec 7, 2012
Earlestown
Work to achieve reduction in journey time to 30minutes between Liverpool and Manchester Oxford Road via Chat Moss from 43 Minutes.
Dec 5, 2011
Skipton Carlisle
Improve journey time between Skipton and Carlisle by increasing the line speed to 75mph in specific sections.
Jul 15, 2011
Halton Curve
Introducing a direct train service from Chester to Liverpool Lime Street via Halton Curve required a second Railway Line.
Jul 5, 2011
Twickenham & St. Margaret
Multi-disciplinary design package for the extension of platforms at number of stations on the Windsor Line sections controlled from the Signalling box...
Nov 16, 2010
West Hampstead
Discover the West Hampstead project, optimising rail signalling and infrastructure for efficient 12-car operations and enhanced commuting.
Mar 8, 2010
Billinghurst
The platforms were to be extended towards Three Bridges to facilitate the use of class 377 rolling stock of 20.4m car.
Nov 25, 2008
Battersea Park
Achieve 12 car operation at the next stage of the development on the South London Line routes operating in and out of London Victoria.
Nov 18, 2008